36KW steam boiler

Working principle:
Electric boiler is by electric heating tube set water tank of water boiling, producing steam convection, and through the league into the steam chamber
Parameter:

Company photo

Technology process






1.Q:Are you a factory or trading company?
A: We are a factory.
2.Q:How long is the warranty period?
A:All of our products have one year warranty.
3.Q:What's the main market of your company?
A:We have customers all over the world.
4.Q:What's your delivery time and payment terms?
A:Normally,it need about 10-30 days.The exact time depends on your company quality.The payment terms always 70% deposits,30% to be paid before shipment.
5.Q:Can we visit your machine operation in your company?
A:Welcome to our factory to see the machine operation.
6.Q:Where's your factory located?How can we visit there?
A:We are in Yangzhou Industry Zone.Jiangsu province,China.You can take the plane to Zhenjiang airport and we will pick you up there.
If you have any problem, please feel free to contact us.


Electric boiler is by electric heating tube set water tank of water boiling, producing steam convection, and through the league into the steam chamber
Parameter:
1.Rated evaporation:(Kg/h)50 | 2.Design pressure(MPa):0.72 |
3.Nominal steam pressure(MPa):0.4-0.7 | 4.Maximum allowable working pressure(MPa):0.7 |
5.Design temperature:171.4ºC | 6.Nominal steam temperature:170.4ºC |
7.Puncture test pressure(MPa):0.92 | 8.Volume(m³)0.04 |
9.Water capacity:29L. Working medium: water, water vapor | 10.Rated power:36(KW) |
11.Rated pressure:380V | 12.Rated current:9.4A |
13.Net weight:58KG | 14.Transport dimension:70*50*130 |
Manufacturing license number :TS2243018-2013,product standardJB/T10393 |

Company photo


Technology process







1.Q:Are you a factory or trading company?
A: We are a factory.
2.Q:How long is the warranty period?
A:All of our products have one year warranty.
3.Q:What's the main market of your company?
A:We have customers all over the world.
4.Q:What's your delivery time and payment terms?
A:Normally,it need about 10-30 days.The exact time depends on your company quality.The payment terms always 70% deposits,30% to be paid before shipment.
5.Q:Can we visit your machine operation in your company?
A:Welcome to our factory to see the machine operation.
6.Q:Where's your factory located?How can we visit there?
A:We are in Yangzhou Industry Zone.Jiangsu province,China.You can take the plane to Zhenjiang airport and we will pick you up there.
If you have any problem, please feel free to contact us.